Sorry, you need to enable JavaScript to visit this website.
Friday , 07th August 2020

Current Tenders

S.No Last Date/Time of Submission Last Date/Time of Sales/Download of Documents Name Of Tender Name Of Work Tender Notice Download Document Download Corrigendum
1 21/08/2020 - 3:00pm 20/08/2020 - 5:45pm Supply, delivery & assembling of Field Water Testing kits with necessary chemicals and supply of 90,000 H2S Vials to TWAD Board THE WORK OF ASSEMBLING OF 1695 Nos. of FULL FIELD KITS & SUPPLY OF 90000 Nos. of H2S vials IN STATE LEVEL WATER TESTING LABORATORY IN TWAD BOARD, CHEPAUK, CHENNAI-5, SUPPLY AND DELIVERY OF CHEMICALS AND OTHER ITEMS MENTIONED IN THE ANNEXURE AS PER STANDARD SPECIFICATIONS TO STATE LEVEL WATER TESTING LABORATORY, TWAD BOARD, CHENNAI, INCLUDING COST OF CHEMICALS, LOADING, UNLOADING, PACKING & STACKING CHARGES AT TWAD BOARD, TRANSIT INSURANCE CHARGES, CHARGES FOR FILLING OF REAGENTS AND PACKING OF FINAL KIT AT TWAD STATE LEVEL LAB ETC., TO COMPLETE AND AS DIRECTED BY THE CHIEF WATER ANALYST OF TWAD BOARD. IFB. No. F. 001 /F. Assembling of Kit/ CWA /TWAD /2020/Dated: 04.08.2020 Download -
2 21/08/2020 - 3:00pm 19/08/2020 - 5:45pm Surveying and levelling by Total Station Method and Trial pit excavation works Formulate a New CWSS to Ottanchatram Municipality and wayside habitations of Dindigul and Tiruppur Districts Surveying and levelling by Total Station Method and Trial pit excavation works through outsourcing for the Transmission Main Feeder Mains and Branch Pumping Mains to Formulate a New CWSS to Ottanchatram Municipality and wayside habitations of Dindigul and Tiruppur Districts taking Thirumoorthi Dam Pickup weir as Source including fixing Bench marks, Preparing alignment plan, LS plan, Ceritified L.F. Book and handing over of 5 sets of Drawings, L.F. books and other connected records along with soft copies in prescribed format etc complete IFB No 2 F Tender Notice DO PF Dn Mdu 2020 Dt 3 8 2020 Download -
3 21/08/2020 - 3:00pm 19/08/2020 - 5:45pm Surveying and levelling by Total Station Method and Trial pit excavation works Formulate a New CWSS to 391 Rural Habitations in Kallikudi, Thirumangalam Usilampatti and Chellampatti Unions of Madurai District Surveying and levelling by Total Station Method and Trial pit excavation works through outsourcing for the Transmission Main Feeder Mains and Branch Pumping Mains to Formulate a New CWSS to 391 Rural Habitations in Kallikudi, Thirumangalam Usilampatti and Chellampatti Unions of Madurai District taking Vaigai Dam Pickup weir as Source including fixing Bench marks, Preparing alignment plan LS plan Ceritified L F Book and handing over of 5 sets of Drawings L F books and other connected records along with soft copies in prescribed format etc complete IFB No 2 F Tender Notice DO PF Dn Mdu 2020 Dt 03 08 2020 Download -
4 19/08/2020 - 3:00pm 18/08/2020 - 5:45pm Request for proposal for Engagement of WASH consultant in SPMU, JJM Engagement of WASH consultant in State Project Management Unit, JJM, Chennai with UNICEF assistance RFP No.15720/F.UNICEF/JJM-1/2020/dt.05.08.2020 Download -
5 12/08/2020 - 3:00pm 10/08/2020 - 5:45pm Balance works of CWSS to 293 Rural Habitations in Musiri, T.Pettai, Thuraiyur and Uppiliyapuram unions in Tiruchirappalli District –period of completion 6 months and 1 year paid maintenance -Sl.No.1 – Foot Bridge From Pier 35 – 38 FROM Head Works to Devanur BS And Ayyampalayam TS to Kodunthurai SP (T-3) / Sl.No.2 - Construction Of 0.10 LL OHT & Hydro Testing (T-11)/ Sl.No.3 - Stand Posts At Peruganoor and Soorampatti (T-12)/ Sl.No.4 - Sirunavalur GS Pumproom, Erection of Pumpset at Uppiliyapuram and Hydro Testing (T-13)/ Sl.No.5 - Branch Pumping Main From Kottapalayam TS to Thalugai GS & Hydro Testing (T-14) Sl.No.6- Pumproom at Devanur BS, Devanur GS, Valasiramani GS & Branch Pumping Main in 250mm DI K7 Pipes from the Karukudi to Marugur and Hydro Testing (T-15)/ Sl.No.7 - Pumproom and OHTs In Thuraiyur Union and Hydro Testing (T-16)/ Sl.No.8 Erection Of Pumpset and allied works In Thuraiyur Union, and Hydro Testing (T-17) IFB .02 / F.CWSS to 293-phase-II/ DO / DB / TPC / TRY / 2020/ Dt:28.07.2020 Download -
6 12/08/2020 - 3:00pm 10/08/2020 - 5:45pm Balance works of CWSS to 293 Rural Habitations in Musiri, T.Pettai, Thuraiyur and Uppiliyapuram unions in Tiruchirappalli District –period of completion 6 months Balance works of CWSS to 293 Rural Habitations in Musiri, T.Pettai, Thuraiyur and Uppiliyapuram unions in Tiruchirappalli District –period of completion 6 months of following the Reaches of -Sl.No.1 – Pumping Main from LS 0 M TO 460 M & Erection of Pump set at HW (T-2) / Sl.No.2 -Foot Bridge from Pier 38 – 40 (T-4)/ Sl.No.3 -Foot Bridge from Pier 40 – 47 (T-5)/ Sl.No.4 -450 mm DI K7 pipes from valavanthi BS in 450 mm DI K7 pipes at LS 460 M TO 14464 M (T-6)/ Sl.No.5 - Pumping Main from HW at LS 14464 m to valavanthi BS and Erection of Pump set at Devanur BS (T-7)/ Sl.No.6- Pumping Main in 400 mm DI K7 pipes From Valavanthi BS TO Devanur BS From LS 0 M to 6902 M (T-8)/ Sl.No.7 - Pumping Main in 400 mm DI K7 pipes from Valavanthi BS from LS 6902 m to Devanur BS (T-9)/ Sl.No.8 Feeder main from Ayyampalayam TS, Erection of Pumpset, and construction of Stand post and allied works (T-10) /Sl.No.9 Branch Pumping Main & Feeder Main From Valavanthi BS To Devanur BS, (T-18) IFB .01 / F.CWSS to 293-phase-II/ DO / DB / TPC / TRY / 2020/ Dt:28.07.2020 Download -
7 26/08/2020 - 3:00pm 24/08/2020 - 5:45pm WSIS to Thenkarai T.P Providing WSIS toThenkarai Town Panchayat in Theni District including maintenance for a period of 12 months (Period of completion – 12 months) F. WSIS to Thenkarai T.P. /SDO I/ CW /2020 /Dt.20.07.2020 Download -
8 10/08/2020 - 3:00pm 07/08/2020 - 5:45pm Sewage Transmission main from TNSCB in Pudukkottai district Providing 1.15 MLD Sewage Transmission main from TNSCB HFA project area for 1920 tenements at Narimedu of Pudukkottai district under deposit work to the existing 10.62 mld STP of Pudukkottai Municipality at Maurpini Grass farm under deposit work including paid maintenance for one year(Period of completion 12 months 03/ F. STM to TNSCB /2020/ SDO /dt.03.07.2020 Download Download (Corrigendum Available)
9 14/08/2020 - 3:30pm 12/08/2020 - 5:45pm NLC - CWSS - CWSS to Thittakudi Package IV Providing CWSS to Thittakudi, Pennadam, Mangalampettai, Vadalur, Kurinjipadi and Gangaikondan, Town Panchayats and 625 rural habitations in Mangalore, Nallur and Virudhachalam, Unions of Cuddalore District with NLC Mine Water as source. Period of Completion – 18 Months, Trial run – 6 Months and paid maintenance of the scheme – 60 Months – Package IV 07 / NLC - CWSS Pkg I to IV / DO / CE / VLR / 2020 / Dated: 08.07.2020 Download Download (Corrigendum Available)
10 14/08/2020 - 3:30pm 12/08/2020 - 5:45pm NLC - CWSS - CWSS to Thittakudi Package III Providing CWSS to Thittakudi, Pennadam, Mangalampettai, Vadalur, Kurinjipadi and Gangaikondan, Town Panchayats and 625 rural habitations in Mangalore, Nallur and Virudhachalam, Unions of Cuddalore District with NLC Mine Water as source. Period of Completion – 18 Months, Trial run – 6 Months and paid maintenance of the scheme – 60 Months – Package III 07 / NLC - CWSS Pkg I to IV / DO / CE / VLR / 2020 / Dated: 08.07.2020 Download Download (Corrigendum Available)
11 14/08/2020 - 3:30pm 12/08/2020 - 5:45pm NLC - CWSS - CWSS to Thittakudi Package II Providing CWSS to Thittakudi, Pennadam, Mangalampettai, Vadalur, Kurinjipadi and Gangaikondan, Town Panchayats and 625 rural habitations in Mangalore, Nallur and Virudhachalam, Unions of Cuddalore District with NLC Mine Water as source. Period of Completion – 18 Months, Trial run – 6 Months and paid maintenance of the scheme – 60 Months – Package II 07 / NLC - CWSS Pkg I to IV / DO / CE / VLR / 2020 / Dated: 08.07.2020 Download Download (Corrigendum Available)
12 14/08/2020 - 3:30pm 12/08/2020 - 5:45pm NLC - CWSS - CWSS to Thittakudi Package I Providing CWSS to Thittakudi, Pennadam, Mangalampettai, Vadalur, Kurinjipadi and Gangaikondan, Town Panchayats and 625 rural habitations in Mangalore, Nallur and Virudhachalam, Unions of Cuddalore District with NLC Mine Water as source. Period of Completion – 18 Months, Trial run – 6 Months and paid maintenance of the scheme – 60 Months – Package I 07 / NLC - CWSS Pkg I to IV / DO / CE / VLR / 2020 / Dated: 08.07.2020 - Download (Corrigendum Available)